TaTasque · user guide

TaTasque User Guide

TaTasque 2.0 · as of 2026-11-06

How to run jobs in TaTasque: capturing work, organising it into jobs, keeping it moving, tracking time and stock, and sharing it with your team, on a phone in the field or at a desk.

00How to use this guide

Each feature starts with a short description of what it is and why you'd use it. Then come How to steps using the words you'll see on screen, a Who can line where your access level matters, and sometimes Good to know notes.

  • Words in bold are buttons, menus and fields exactly as they appear. An arrow (→) means "then choose".
  • Where a phone works differently, the step says On a phone:.
  • Access levels, from most to least: Owner, Admin, Member, User, Visitor, Viewer. See People and access.

01Why TaTasque

TaTasque puts the whole life of a field job in one place: the request, the work, the time spent, the stock used and the photos taken. It is built for people working on site with a phone as much as for the office.

One place for every jobTasks, time, stock, photos, plans and companies sit together, so nothing lives in a separate spreadsheet or someone's camera roll.
Built for the fieldPhone-first screens, a quick-note button for "note it and go", photos from the camera, and the map with your plans and drawings laid over it.
Forms that fit the jobEach list has its own workflow and layout, with boxes, required fields and inherited companies, so people only fill in what matters.
Work keeps movingStatuses in one order, road blocks that say what's in the way, and messages and a bell so the right person hears about it.
Know where stock wentEvery box of screws and roll of tape is a logged movement. Audits show what's missing, where, and who held it.
Nothing is quietly lostMistakes are reversed, not erased; anything uploaded can be downloaded; changes that would lose values warn you first.
Right access for each personEach person sees and does what their level allows. People are shown by name, never by email.
Your data, your choiceTaTasque stands on its own. It can stay linked to other programs, but doesn't depend on any of them.

02Getting started

Signing in Live

Open TaTasque in your browser and sign in with your email and password. Your email is only your username; everyone else sees your name.

How to

  1. Open TaTasque and sign in. New here? Choose Create an account.
  2. Set the name people see: tap your initial (top right) → Your name.
  3. Forgot your password? Use the link under the sign-in form; a reset link is emailed to you.

Deleting your login Live

You can delete your own login at any time. The work you shared stays with your team.

How to

  1. Tap your initial (top right) → Your name → Delete my login… at the bottom.
  2. Read what will be deleted and what stays, enter your password, type DELETE → Delete my login.

Good to know

  • If you own a company, hand it over or close it first; the screen says what is in the way.
  • Tasks, time, photos and messages you shared stay, shown as "Former member". You can sign up again later with the same email, as a new person.

Install on your phone Live

Put TaTasque on your home screen so it opens full screen, like an app. Nothing to download from a store.

How to

  1. Tap your initial (top right) → Install app. On Android in Chrome, if the menu item doesn't install straight away, follow its sheet: tap ⋮ (top right) → Install app (or Add to Home screen). In another Android browser, open the page in Chrome first. On an iPhone in Safari: tap Share (the square with the arrow) → Add to Home Screen.
  2. Open TaTasque from the new icon and sign in once inside.

Good to know

  • Once it's installed, Install app no longer shows.

Companies and projects Live

Work is organised as companies (for example Acme) that own projects (for example Acme Site Works). Stock, the companies you work with, safety and quality belong to the company and are shared by its projects.

How to

  1. Switch project: tap the project name (top left) → choose one. Projects someone has shared only part of with you are listed under Shared with me.
  2. Start a new project: project name → + New project. If your company keeps project templates, Start from lets you begin blank or from one of them (see Templates).
  3. Company settings: the Company button (building icon) in the top bar.

Joining a project Live

You join by invitation. The project opens straight away once you accept.

How to

  1. Open the emailed invitation link.
  2. Sign in, or create an account with the same email.
  3. The project opens, and a note says what level you joined at.

Finding your way around Live

The top bar holds the views and the menus. On a phone, the views move to a bar at the bottom.

How to

  1. Views: the top bar starts with just Tasks and Map. Calendar, Diary, Stock, Emails and anything else you use a lot are yours to add: tap the small pin on a tile in the Project or Company page (its tip reads Pin to the top bar). A view you haven't pinned waits under the Project cog → Views. See Setting up. The bottom bar shows Tasks · Map · your pinned views · More. More holds the rest, and says why a view isn't available.
  2. Add something: the round + button → New task, Note or Plan time. If your company has order forms that place work where you are looking, each one is listed here by its name too. There is no separate New task button on the top bar.
  3. On the Map, New task and a form each ask for the spot first: move the map until the crosshair is on it, then Use this spot (or Cancel). The Map remembers where you were looking, in each project, on the device you use, and comes back to it. A form opened from the Map starts its own map in the same place.
  4. Menus: the cog (Project) for this project's settings, Company for the company's, the bell for notifications, and your initial for your own settings, plus User guide, Terms of use and Privacy (each opens in a new tab). On a phone or a tablet the Project and Company buttons show as icons only: the cog is Project, the building is Company.

03How tasks come in

There are four ways a task can arrive in TaTasque.

Added by a person Live

Tap + → New task, choose where it belongs, fill in the form and create it. A quick note can also be turned into a task later. If you can see a project but cannot make tasks in it, the + lists its order forms instead (see Request forms and orders).

Best for: day-to-day work, phone or desk. See Working with tasks.

Excel import In testing

Upload a spreadsheet, match its columns to your fields (or create new fields from columns in one go), review the rows and apply. Imports can be cancelled and are kept in a history. Project cog → Import tasks

Best for: bringing in a batch of jobs or an existing register.

API and linked systems Live

Other software can create and update tasks through TaTasque's API. This is how a two-way link with another program runs. Connections are set up per project by an administrator.

Best for: systems that already hold jobs or requests.

Request forms Live

A form with its own link and QR code. A client or site contact fills it in, and the order goes straight in as a task, with the person and their company added to your lists, marked Please verify until someone confirms them.

Best for: requests from clients and the public. See Request forms below.

Request forms and orders Live

Build a short form for a list or a project. Share its link or QR code. When someone fills it in, the order goes straight in as a task: there is no Accept or Decline step to wait for. The task, the person and their company are added at once, and the sender is marked Please verify until someone confirms them.

How to

  1. Make a form (on a computer): the Project cog → Workflows & fields → Request forms → + New request form. Name it, say where its orders go (one list, or sorted into a folder for each company) and add its questions. A new form starts empty: nothing is on it until you add it. The preview shows it as a phone will.
  2. Share it: Copy link, or Download QR to print it or put it on a sign.
  3. Someone with no account opens the link and types their email in Find yourself. If we know that email, a code is sent to it; type the code and their details fill in. If we do not know it, they fill in the form below. Either way the order goes in.
  4. Company found: when a new sender types a company that is already on your list, the form asks Company found in our database: “…” — is this your company? Yes links the order to that company. No treats it as a new company.
  5. Verify: open the task: its request card has one Verify button. It confirms the person and their company in one click. The account Owner and Admins can press it, and so can any person already verified in that same company. Until then the sender sees only their own job. Nothing else needs accepting.
  6. Signed in already? Someone who is signed in to TaTasque needs no code and no Find yourself. Their name, phone and email come from My details, and their company from My company (see People and access). Joining a company as one of its people is still confirmed with Verify.
  7. Placing an order from inside the app: if you can see a project but cannot make tasks in it, tap + and choose the form by its name. It opens already filled in for you. On the Map, you first pick the spot (Use this spot, or Cancel), and the form opens with that point on its map, looking where the Map was.

Good to know

  • Editing a form needs a computer. On a phone you can switch a form on or off and share its link or QR code.
  • A form maker adds every question deliberately, including Company, Direct supervisor and Individual or company. A question can be asked only when an earlier answer says so; the Map in the form builder shows the whole flow.
  • Company details (contact person, phone, email, address and so on) can be added to a form. A detail marked Required in the company list is asked only when it is missing for that sender's company. Details already on file fill in by themselves.
  • Plans on a form: the maker chooses which plans the sender's map can show (all the project's plans, or chosen folders), and who can see them: Anyone with the form link or Only people who've confirmed who they are. On the form's map the sender opens the layers icon (Plans), ticks a plan to show it, fades it with the See-through slider, and taps Go to to jump to it. Plans start switched off, the map never jumps to one by itself, and they are view only: just the picture, never a download. Any part you hid with Show only… stays hidden.
  • The sender gets an email with a link to follow their order. The email says their details are waiting to be verified.

Who can: make forms: Admin and up. Press Verify: Owner, Admins, or a verified person of that company. Place an order: anyone who can see the project.

04Working with tasks

Creating a task Live

A task is one piece of work: a title, where it belongs (job › folder › list), a status, and the fields its list's form asks for.

How to

  1. Tap + → New task. From the Map, you pick the spot first (move the map so the crosshair is on it → Use this spot), then fill in the form.
  2. Choose the Destination (the list it belongs in). The form changes to that list's fields.
  3. Fill in the title and fields. Required ones are marked *.
  4. Create task. Tick Create another first to keep the form open for the next one.

Who can: User and up.

The task list Live

Your tasks, grouped by status, with search, filters and sort. The same filter drives the map and the board.

How to

  1. Search by title or task number in the box at the top. A search is only for now: it clears by itself when you change folder or view (Tasks, Map, Calendar …) or reload, and opening a task keeps it. The count line (for example “1 of 3 tasks — search “zebra” · Clear”) has a Clear link that removes the search and any filter rules in one tap. Filters are remembered.
  2. Sort with the box next to Filter: Newest, Oldest, Status or Priority.
  3. Tap a task to open it.

The task menu and Select Live

Every task in the list and on the board has a ⋯ menu for the common changes, and Select lets you change many tasks at once.

How to

  1. Tap ⋯ on a list row or a board card. On a phone: press and hold a task; the menu rises from the bottom.
  2. Choose: Open, Select, Change status, Assign…, Start / due date…, Priority, Move to…, Duplicate, Copy link, Archive (or Restore) and Delete. You only see what you may do.
  3. Several at once: Select puts a tick on each task. Shift-click a second task to tick everything between. Select all ticks what is shown. A bar then offers the same changes for everything ticked.
  4. Archived tasks: Filter → Show archived lists them; Restore brings one back.

Who can: User and up make the changes.

Good to know

  • Move to… opens the same sheet as in the navigator (see Moving a folder, list or task).
  • A change that isn't allowed (for example a status move that needs a reason) says why and changes nothing.

Filters Live

Build a filter on any field: status, assignees, destination, your own fields, priority, road blocks and more. It applies to the list, the board and the map together.

How to

  1. Tap Filter → + Add filter.
  2. Pick the field. Fields are grouped under headings: Task (the built-in ones), Fields, your field groups (for example Site details) and module headings such as Priority. Fold a heading or use Expand all; type to jump to a field.
  3. Pick the condition (for example is one of), then the value. For a list of values, tap the value box ("Choose…") to open the choices, tick them, then Done.
  4. Add more filters, or + Add group to mix ALL and ANY. Clear all removes them; Done closes the filter.

Good to know

  • The number on the Filter button is how many filters are on.
  • Needed finds tasks still missing a required field.

Board view Live

The same tasks as cards in one column per status, in workflow order. Drag a card to move it along.

How to

  1. On the Tasks view, use the List / Board switch in the toolbar. Your choice is remembered for each project.
  2. Move a task: drag its card to another column, or use the card's ⋯ → Move to… (the keyboard-friendly way).
  3. Add a task in a status: + Add task under a column starts a new task in that status.
  4. A long column shows the first 50 cards; Show more loads the rest.

The board is for computers and tablets; phones always show the list.

Good to know

  • A move that isn't allowed snaps back and says why.

The task panel Live

Opening a task shows its form and its tabs: Details, plus Work (its time, stock and equipment), Safety (its Take 5s, permits and traffic), Comms and Events or What to do when those are switched on. Status and Priority are the top row of Details.

How to

  1. Change any field: it saves by itself. A pick (status, a list, a tick, a date, people, the company) saves at once. Typed text saves when you leave the box, press Enter, or stop typing for 3 seconds.
  2. Top right shows Saving… then Saved ✓. To take back your last change, tap Undo beside it within a few seconds.
  3. Description grows with its text, so a long description shows in full (on a computer up to most of the screen; then it scrolls).
  4. Status and priority: the two pickers at the top of Details. Tap one and pick; it saves at once. Under them: the task's destination and when it was created.
  5. Work tab: a small switch, Time · Stock · Equipment (those switched on for you), opening on Time. Safety tab: Take 5 · Permits · Traffic, opening on Take 5. A tab with nothing switched on for you isn't shown. Each part shows what that task has; see the Diary.
  6. Dates: Start date and Due date are fields on the task (the list's menu also has Start / due date…).
  7. Location: the pin beside Lat, Long (Pick on map). On a computer it uses the Map screen's own map with the form kept open, so what you typed isn't lost; the Lat and Long fill in when you set the spot.
  8. Drawing: when the project has drawing sets, Details has a Drawing row: choose a set and a page, then Show on map. The map goes to that page; the pager's ✕ puts your own view back.
  9. The task's ⋯ menu (top right): Edit details layout (Admin) opens this list's layout editor; closing it redraws the task with the saved layout.
  10. Share it: the link button beside ✕. On a phone it opens your share sheet; on a computer it copies the link (Link copied).
  11. Move to another list: Destination → Change. If the new list uses a different form, a warning lists what it affects (fields it doesn't have, a status it doesn't use) before you go ahead.
  12. Boxes fold sections open and closed; how they start is set per list.
  13. Make the panel wider or narrower (computer or tablet): drag its left edge. Or click the edge and use ← (wider) and → (narrower); hold Shift for bigger steps. Double-click the edge to put it back to normal. Your width is remembered on this device. The task fills the screen, as before; there's no edge to drag.

Good to know

  • Required fields are marked *. Older tasks missing one show "Needed".
  • Moving to a list that doesn't use the task's status gives it that list's first status, and says so. You can change it straight after.
  • A status change has no Undo: pick the status you want instead (moving back asks why).
  • While a task is open, the address bar shows its link: refresh and it opens again; Back closes it. Only people with access to the project can open a task's link.
  • Only one task is open at a time: tapping another card, pin or calendar entry switches to it.
  • When a project's fields change (a field added, renamed or removed), open forms redraw by themselves; what you were typing stays.
  • Someone who can only view the task sees its status and priority as coloured badges instead of pickers.
  • The panel is at least 380 px wide and at most 70 % of the window. When it's wide (for example on a big screen), short fields sit side by side in two columns; long text boxes and lists of choices keep the whole row.
  • If a change can't be saved (for example an empty Title or a required field), the box turns red and says why. What you typed stays in the box until you fix it.
  • No signal? It says Saved on this phone and sends when you're back online.
  • If someone else changes the same field while you're typing, you're asked which to keep before anything is sent.

Priority Live

Every task has a priority, from P1 Critical down to P7 Optional, so the urgent work stands out. It shows as a small coloured dot with the level's symbol beside the status: in the list, on board cards, in map pop-ups.

How to

  1. See the whole level: hover over the dot (computer) or tap it (phone): its number, name, symbol and description, e.g. "P4 · Normal = · …". Tapping the dot doesn't open the task.
  2. Set it on a task: open the task → Priority (the top row, beside Status) → pick a level. It saves at once.
  3. New tasks start at P4 Normal. Change it on the New task form before Create task.
  4. Find the urgent ones: Filter → + Add filter → field Priority → is above → Normal.
  5. Sort by it: the sort box → Priority. P1 comes first.
  6. Change the levels for your company: Company → Priority levels. Rename a level, change its symbol or colour, reorder, add P8 and beyond, or choose a different default.

Who can: anyone who can edit a task can set its priority. Changing the company's levels: the account Owner and Admins (others see the list read-only).

Good to know

  • On the map, only P1–P3 show their symbol on the pin.
  • Removing a level that tasks use asks you to move those tasks to another level, or retire it. A retired level stays on its tasks, marked "(retired)", but is no longer offered.
  • Priority is TaTasque's own; it isn't sent to a linked system.

Statuses and workflows Live

A project's statuses come in one order, and every list's workflow uses some of them, always in that order. The board's columns follow it, and moves along it are forward; going back can be set to need a reason.

How to

  1. Open the editor: Project cog → Workflows & fields → Workflows. The Status row's Statuses & workflows…, the board's Edit workflow and a list's ⋯ → Workflow… in the navigator all arrive here.
  2. Project statuses (the top): Edit statuses opens the order. Drag rows or use ↑ ↓, + Add, pick a colour, tap a name to rename it, ✕ to remove it (asks where its tasks move). Each of these saves at once.
  3. Blocking & done: per status, Blocking (a task here needs a road block) and Done (a task here is finished).
  4. Workflows (below): each workflow is a card with its statuses and "Used by N lists". Tap one to open its page. + New workflow starts a guided set-up.
  5. A workflow's page: its name (rename it at the top), its Statuses (tick the ones it uses → Save statuses), Edit the details layout →, the lists using it, and Duplicate / Delete.

The editor shows a read-only summary; open TaTasque on a computer to change statuses and workflows.

Who can: Admin and up.

Good to know

  • When Reason for moving a task back is switched on for your company (Company → Features), earlier statuses are marked "(back)" in the status list, and moving back asks Move back to …? with a Reason. The reason is kept on the task's Comms timeline. On the board, cancelling says "Not moved — moving back needs a reason."
  • A status that tasks are in can't be unticked from a workflow; move those tasks first.
  • The layout of a workflow's form is edited in the Details layout.

Details layout Live

The details layout is how a workflow's task form is arranged: which fields show, which are required, and the boxes that group them. You change it by dragging, and it shows the way a person will see it.

How to

  1. Open a workflow's page (Workflows & fields → Workflows → the workflow) → Edit the details layout →. Or, in any task, the ⋯ menu → Edit details layout.
  2. Every field is a card. Drag a card by its handle (⠿) to move it, into or out of a box. Drag a box by the handle in its header. From the keyboard: focus a handle, then ↑ / ↓.
  3. + Add a field lets you tick several fields at once (Select all per group, a search, Add into box). + Add a box makes a box; rename it in place; Starts closed sets how it opens.
  4. To fill a box: tap the box (or Pick fields), tick the fields that should move in, then Move N into …. Untick one to take it out. Shift-click ticks a run.
  5. Each card has a Required switch and ✕ (take it off this layout). A field with choices has Choices… (which choices this workflow offers).

Who can: Admin and up.

Good to know

  • Every change saves at once ("Saving…" then "All changes saved").
  • The project default's layout (Details layout → on the Project workflow line) shows every field, so there you can only arrange the boxes.
  • The older Arrange form screen is still a tab on Workflows & fields.

05Jobs, folders and lists

Every task sits in a list, inside folders, inside a job (for example 1001 › Site › Stage 1). The job is used by the time clock, the map plans, companies and safety.

The navigator Live

The project's job tree on the left, like a file explorer, with task counts. Choosing a job, folder or list narrows the tasks, the board, the map and the calendar to it.

How to

  1. The top rows are the projects of your company: the open one shows its jobs, folders and lists, and tapping another switches to it. Tap a row to scope everything to it; tap the project's own row to see everything again.
  2. Open or close a folder with its arrow. Open folders stay open when you rename, move or reload.
  3. Manage the tree: a row's ⋯ → + Folder, + List, New job from this…, Save as template…, Rename, Move to…, Retire or Delete. Rows can also be dragged.
  4. Put them in order: a row's ⋯ → Move up, Move down or Sort A–Z; or Alt + ↑ / ↓; or drag a row to the top or bottom edge of a neighbour. Dragging onto the middle of a folder moves it into the folder.
  5. Jobs: Project cog → Jobs lists the project's jobs, with New job. Tap a job for its own page of tiles (its people, records, time and so on, for that job only).

The navigator opens full screen from the project name.

Who can: everyone sees the tree; managing it is for Admin and up.

Good to know

  • Moving a task's list or job warns you when its form or its sharing would change.
  • A linked project's lists say whether they're connected to the other system.
  • If your company has Folders all the way down switched on, any folder holds tasks and other folders as deep as you like, and the screens say "folder" where they said "job".

Moving a folder, list or task Live

One sheet does every move: a folder or list (with everything in it) or a task, from the navigator, the task menu or by dragging. It shows what will change before anything is written.

How to

  1. A row's ⋯ → Move to… (or a task's ⋯ → Move to…, or drag a row onto a folder).
  2. Where to: search and pick the folder. Where it sits now says "Here now".
  3. Check: it shows From → To and the workflow it will follow there. If the new workflow lacks a status that tasks are in, each such status is listed with its task count: pick one of the new statuses, or Keep it, marked "Not in this workflow". Each row starts on a suggestion.
  4. It also lists what else changes: who gains or loses sight of it, the company, the principal contractor and emergency details.
  5. Move here (it waits until every status row has a choice). Cancel, ✕ or Esc writes nothing.

Who can: Admin and up for folders and lists; User and up for a task.

Good to know

  • If the plan changed while the sheet was open, it says so and offers Check again.

Templates In testing

Save a set-up once and reuse it. A job template is a job's empty structure (folders, lists and their workflows). A project template is a project's set-up (jobs, folders, lists, fields, workflows, statuses and settings), never its tasks, people or money.

How to

  1. Save a job: its row's ⋯ → Save as template… → name it. Project cog → Jobs → Templates lists, edits and deletes them.
  2. Save a project: Project cog → Save as template…. The company's list: Company → Project templates (rename, delete, see what's in each).
  3. Use one: + New project → Start from.

Who can: project templates: the company's Owner and Admins. Job templates: whoever may change the job tree.

Sharing part of a project Live

Give someone access to just one job, folder or list, and everything inside it, without adding them to the whole project.

How to

  1. In the navigator, the row's ⋯ → Share….
  2. Under Add someone, pick a project member or Someone else — by email…, choose a Level (Admin, Member, User or Viewer), then Share.
  3. Change a level, or Remove someone, in Shared here. Can see it anyway lists people who see it another way.

Who can: Admin and up on the project, or someone shared at Admin level on that part. You can only give your own level or lower.

Good to know

  • The person sees the folders above it greyed, as "the way to what's shared with you"; they can open them, but nothing else in them.
  • Anything added inside later is shared too.
  • Moving a shared part warns who will lose or gain sight of it.

06Road blocks, messages and emails

Road blocks Live

A road block says what's stopping a task: waiting on the client, a permit, another task. It marks the task in the list and on the map until it's resolved. Each kind of road block is an issue with its own short ID, like QTE-1, so it's easy to talk about and find.

How to

  1. Put the task in a blocking status (road blocks can only be raised there) → Details → Road blocks → + Add road block.
  2. Choose the Label (the issue), describe it, and choose How will it be cleared?: A reply or a note, or Another task is finished (then pick it under Waiting on).
  3. + New task to clear it opens a new task; the first one you create is linked ("… now waits on …"), and the road block clears itself when that task is finished.
  4. Optionally tick Email now, then Add road block (or Add and email).
  5. Follow it: the task's Comms tab → Road block shows each one by its ID, its stage, the emails and its Activity. Email again… or Add response… from there. A task with an open road block opens on this section.
  6. When it's cleared: Resolve → How was it resolved? (optional) → Resolve road block. Tick Let them know to email the people involved. Withdraw is for one raised by mistake.

Who can: User and up. Issues are set up by Admin and up (see Setting up road blocks).

Good to know

  • Park and resume: leaving a blocking status with open road blocks asks you to Resolve and save or Leave unresolved. Left unresolved, a road block is parked: kept with its history under Parked road blocks, but not marking the task, and its reminders wait. Back in a blocking status, you're offered Resume the road blocks?, or use Resume on one.
  • Marks you'll see: "Blocked", "Needs a resolution", "! Action required" (the task was completed while still waiting, or the task it waited on was deleted).
  • Filter with Road block (has any of …) or Road-block mark (including Parked).
  • Projects that haven't moved to issues yet still use plain labels (set in Fields → Road block); everything else works the same.

Setting up road blocks Live

Decide which issues people can raise, who is emailed, what a new task to clear it looks like, and when reminders go out.

How to

  1. Project cog → Workflows & fields → Road blocks, and choose the Workflow.
  2. This workflow: tick Every road block sends an email if you want that, choose Send To (the people in these email fields) and Copy to → Save. Use the project's default goes back to the project's setup.
  3. Issues: + Add an issue. Give it a name (Issue) and an ID prefix of 2–5 letters (EQ gives EQ-12). Choose What happens: Email someone and wait for a reply, or Make a task that clears it (and tell someone).
  4. Write the Email subject and Email message; the chips insert the task, title, label, description, note or sender.
  5. For a task issue: Copy these fields to the new task and The new task's list (or Use the blocked task's list).
  6. Save issue. Use ↑ ↓ to order them; Retire hides one from new road blocks (Restore brings it back).

Setting up is easiest on a computer; raising and resolving road blocks works fully on a phone.

Who can: Admin and up. Company defaults (the stage names and the company's reminder steps): the account Owner and Admins.

Reminders

  • For an email issue, If nobody replies: Use the company's steps, Don't escalate, or Its own steps (+ Add a step: "After N working days, copy …" an email field, the next supervisor up, or the To person's work group). Up to 6 steps.
  • Working days are Monday to Friday, counted from when the road block's email went out. Each reminder goes to the same people again, plus that step's copy, in the name of whoever raised it.
  • A reply, closing it or parking it stops the reminders. Task issues never send reminders.
  • The ID prefix can't be changed once the issue has been used.

The Emails area Live

Every email sent from the project's tasks in one list, so you can see what's still waiting and follow it up.

How to

  1. Open Emails in the top bar. More → Emails. On a tablet: the Project cog → Emails.
  2. The list: filter with All, Waiting for a reply, Replied or Not sent, or type in Find in subjects. Each row shows the subject, the date, the task, who it went to, the road block's ID, and badges such as Reminder 2 or Bounced. Show more loads older ones.
  3. Tap a row to open its task on the Comms tab.
  4. Board: the road blocks in columns by stage (for example Email sent — waiting, Notified — task created, Closed; your company can rename the stages), so you see at a glance what's still open. Cards move by themselves as emails go out and road blocks are resolved; Close on a card when it's done. Closed shows the last 30 days. One stage at a time, with a switch to change stage.
  5. Statistics (account Owner and Admins): choose From and To dates (the last 30 days to start), Group by person emailed, sender, road-block label or project, and This project or All projects → Show. It counts emails sent, escalations and those still waiting. Download CSV saves the table.

Who can: you see the emails on the tasks you can see; Statistics is for the account Owner and Admins.

Good to know

  • People are shown by name, never by email address.
  • The switch at the top (Emails · Board · Statistics) only shows the parts you can use.
  • The Emails area needs Email from tasks switched on for the company; otherwise it says so.

Messages on a task Live

Talk about a task where everyone working on it can see: messages, emails and road-block history in one timeline on the task's Comms tab. There are two kinds of message, and the box says which you are writing.

How to

  1. Open the task → Comms.
  2. Internal messages are for your team only. View-only messages are read by the people the job is shared with, so post there only what they may see. Type in the box, use @ to mention someone who can see the task, then Post (or Ctrl / ⌘ + Enter).
  3. Filter the timeline with All, Internal messages, Emails, Road blocks or View-only messages; Show older loads more.
  4. Reply under a view-only message answers it in its own thread. Members can also Reply to an email that came in; people with view-only access can only comment.
  5. Your own message: change it within 10 minutes, or withdraw it any time.

Who can: everyone who can see the task. @everyone is for the account Owner and Admins.

Unread messages

  • A red number marks what has been received and not yet marked read: emails that came in, and messages, view-only messages and replies from other people. Your own posts and automatic emails never count. It shows on the task in the list, on the Comms tab, and on All and each type.
  • Opening the task does not clear it. Tap Mark as read (for staff: Mark read — I'll handle it) on the message. When one team member marks it, it clears for the whole team and shows who is handling it.
  • Folders and the project in the left tree show the total of the red numbers inside them. On a folder or the project, ⋯ → Clear all unread clears everything under it at once.
  • Received emails are shown tidy: the signature and earlier messages are folded away.
  • A withdrawn message shows that it was withdrawn, never its words.

Notifications Live

The bell in the top bar collects the times someone mentions you, so you don't miss them.

How to

  1. Tap the bell. The number shows how many are unread.
  2. Tap one to open its task on the Comms tab. Mark all read clears the count.
  3. Choose how you hear: your initial → My notifications (in the app and by email, per kind).
  4. For the whole company: Company → Notifications switches a kind off for everyone.

Who can: everyone has the bell and their own settings. Company notifications: the account Owner and Admins.

Good to know

  • Notification emails never contain the message text; you read it in TaTasque.

07Quick notes

Note it and go Live

Jot something down on site in seconds: a line of text, a photo, where you are. Turn it into a task later.

How to

  1. Tap + → Note. Type a line; add a photo. Your location is added automatically if you allow it.
  2. Save. The note is stamped with the date and time and belongs to the open project.
  3. Later: See all notes → a note → Convert to task. Its text fills the title and description, its location fills Lat, Long, and its photos move onto the task. Tick several to convert them one after another.

Who can: only you can see your notes.

08Company

Company on tasks Live

Your company keeps one list of the companies it works with — clients, suppliers, subcontractors and others — with their contact details. A task's Company box shows who the work is for and how to reach them.

How to

  1. Set a company on the whole project, on a job, or on one task. A task uses the nearest one, shown in grey with "from job …" or "from project".
  2. The picker shows each company's kind beside its name, for example "Ajax Engineering · Supplier". Your own company isn't offered.
  3. In the Company box, tap the number to call or the address to email.
  4. The Company box also shows the company’s details (address, phone, billing email and so on) inside it. It sits closed while all the required details are filled in, and opens by itself, marking the gaps Needed, when one is blank. If you may edit that company’s row you can fill them in right there.
  5. Open company page shows everything for that company in one place.
  6. The list itself: Company → Tables → Company (if you rename the table, use its new name). Each has a Kind: Client, Supplier, Subcontractor or Other.

Good to know

  • When stock is on, every task needs a company.
  • A company's page can also hold its people and their roles (org charts). Opened from a company's page, the chart shows that company only.
  • Senders and companies that arrived through an order form are tagged Please verify in the lists until someone verifies them. Tick Please verify to see only those.
  • Admins decide which company details are needed to bill a customer. Open Fields → Company box and use + Add company details to add one; it is added to the company list for every project and can be asked on forms as Company details.

09The map and plans

Tasks on the map Live

Every task with a location, as a pin in its status colour. The same filters and navigator scope as the list.

How to

  1. Open Map. Tap a pin for the task's summary and to open it.
  2. New task here: + → New task → pick the spot → fill in the form.
  3. My location centres on where you are; Search places finds an address.
  4. The Map remembers where you were looking (centre and zoom), per project, on each device, and returns there when you come back.
  5. Measure on the map: the ruler in the left tool column. Add points (a crosshair in the middle of the map on a phone, or click on a computer) to see each leg's distance and bearing and the total. Undo, Clear, Copy, Done. A measurement isn't saved.

Good to know

  • Pins show a clock while time is running, a corner badge for road blocks, and the priority symbol for P1–P3.
  • Bearings are true bearings with the ground distance. In a project with a map grid set (Project settings), the grid bearing and distance are shown too. The readout says how precise it is; satellite pictures can be a metre or more off the grid.

Plans over the map Live

Lay a plan (a picture or one page of a PDF) over the map, line it up, and see your tasks on it. Plans belong to a job, and show in that folder, its sub-folders and their tasks, or on the whole project.

How to

  1. On the Map, tap Plans (left tool column) and choose the Job: pick a folder at any depth, the whole project, or A task… to show a plan on one task only.
  2. + Add plan → choose a PNG, JPG or PDF (for a PDF, tap the page to use). It's placed over the current view, north up. Or, from a task, tap Use as a plan beside one of its files, photos or a received email's attachment (a PDF or a picture), and say where it goes. It is made at once; open on the Map takes you to it.
  3. Each plan is one compact row: the eye shows or hides it, the See-through slider fades it. Tap a row's name, or tap the plan on the map, to pick it. The row you picked has one toolbar above the list, headed by its name, and every tool acts on that plan. The main tools are Line up, Scale & bearing, Move, Snap to a point, Adjust corners, Show only… and Go to. The ⋯ button opens the rest (Duplicate this page, Lock position, View / download, ✎ Notes, Delete). Hide tools folds the toolbar away so you can see more of the list.
  4. Line up it with the map: move the plan so the crosshair sits on a feature → Set point 1 on plan → move the map onto the same spot → Match point 1. Repeat for at least 2 points (up to 4) → Save. The plan and map panes are stacked; on a computer they sit side by side.
  5. A quicker way: Snap to a point. Tap a point on the plan, then the same spot on the map, then Snap. One point moves the plan and keeps its size and direction; add a second point and it turns and resizes too.
  6. Or use Scale & bearing, Move, or Adjust corners by hand. Tools that need the plan placed say Place the plan first until it is.
  7. Show only… hides the parts you don't want (the title block, legend, insets). Tap the corners of the part to show, going round it; drag a point to move it, tap the outline to add one → Save. Clear “show only” brings the whole picture back.
  8. Duplicate this page makes another copy on the same picture, so you can line it up and trace a different part on its own (for example two views on one drawing).
  9. Lock position (under ⋯) stops Move, Snap to a point, Adjust corners and Line up until you Unlock position. A locked plan shows a padlock on its row, so a plan that is right stays right.
  10. Also on each row: Go to, View / download, Delete.

Who can: everyone sees and shows / hides plans; adding, lining up, Show only, Duplicate, Lock and deleting is for Member and up.

Good to know

  • Pictures are shrunk to 4096 px and 8 MB when added.
  • Lining up shows its accuracy (± m) and flags the odd point out.
  • Plans for other people: people the job is shared with (view only) see the plans for the jobs they can see, on the Map tab, with a small layers tool (Plans) to show, hide and fade them with See-through. They cannot change them. What you hid with Show only… stays hidden for them, and for people using a plan link.
  • A request form can show chosen plans on its map (see Request forms and orders).
  • Each plan row can show when it was changed, and the list can be sorted or filtered by age.

Drawing sets Live

A whole PDF of drawings as one set: every page becomes a plan, and pages of the same size line up together, so you line up one page and the rest follow.

How to

  1. Plans → + Add drawing set → choose the PDF (up to 200 pages, 100 MB) → name the set → Add N pages.
  2. The set is one row in the Plans panel. Its eye shows or hides all its placed pages together. Pages (N) opens a grid of the pages, where you choose which pages show.
  3. Line up whole set, or Line up on one page for a page that differs.
  4. Remove on a page takes out that page (the others keep their numbers); Delete set removes it all.

Big sets take a while to add on a phone; a computer is quicker.

Who can: everyone shows and hides pages; adding, lining up and removing is for Member and up.

Good to know

  • With a plan showing, you can zoom in past the map's own detail: the background goes plain and the drawing keeps growing.
  • Drawing-set pages redraw sharp from the original PDF as you zoom in.

Print a plan to scale Live

Print what is on the map, at a true scale on A3 or A1 paper, with your company's plan form (the title block) and logo.

How to

  1. On the Map, tap Print a plan to scale (the printer in the left tool column).
  2. In the print bar choose the paper (A3 or A1), landscape or portrait, a scale (1:50 up to 1:2000) or Fit, and the task whose details fill the plan form. A frame at true ground size shows on the map: move the map to place it.
  3. Choose the logo (the task's client company, your company or another company), what goes underneath (nothing, the street map or satellite) and, on a portrait sheet, whether the plan form runs down the right or along the bottom.
  4. Make PDF.

Good to know

  • The title block on screen: boxes with no value show dashed, with light words ("Not filled — Client"). Under it, each empty box has one action: Add a logo (pick a picture; it is kept in that company's record and the plan uses it at once) or Fill in (type it there, or it takes you to where the value lives). The printed plan leaves a box blank if it is still empty.
  • Edit the plan form itself in Company → Plan form (Owner and Admins; Back to the standard plan form undoes your changes, the logo stays).

Drawing and shapes on the map In testing

Draw on the street or satellite map for a task or a note, and put a task on the map as a line or an area, not just a pin. Each is switched on per company (Drawing on the map, Shapes on the map).

How to

  1. Draw: open a task's pin (or a note) on the map to pick it, then ✎ Draw. Tools: pen, line, arrow, box, circle, dimension and a note with a leader (and a photo).
  2. Temporary drawing (no task needed): with nothing picked, ✎ Draw draws a Temporary line at once. With a task picked, it asks On this task or Temporary. Temporary lines are dashed, only you see them, and they stay until you delete them: Delete all temporary is in the pen's menu, or pick one line and delete it. They are never printed and never put on a task. Good for a quick line to help line two plans up.
  3. Shapes: a task's Place on map under Lat, Long offers a point, a line, an area, a rectangle, a square or a circle. From street zoom in, a task with a shape is drawn in its status colour; tapping it opens the same pop-up as the pin.

Traffic: placing signs In testing

Record the signs and devices set out for a task: where, which way they face, photos and signed set-up, change and pack-down copies. Switched on per company (Traffic, which needs Road blocks and Map plans).

How to

  1. Open the task → Safety → Traffic → Place a sign (with the phone's camera and compass), or Place on the map.
  2. For the map or a plan: Place on the map (or + Sign on a traffic plan page) opens a sheet that asks Which sign do you want to place?. Pick the sign first. This is add sign mode.
  3. A dot appears in the middle of the screen. Move the map or plan underneath it until the dot is on the spot, then press Place sign. Dragging or pinching only moves the view, so a sign is never added by accident.
  4. The mode switches off after one sign. Tick Keep adding to place several in a row. A just-added sign shows Sign added · Undo for 10 seconds.
  5. Change sign picks a different one; Done (or Esc) stops.
  6. Later: Move, Turn, Cover, Change sign, Note or Remove on each sign. Nothing is ever deleted, every change is kept as an event.

10Time, plans and the roster

The time clock Live

Record the time spent on a task as you go, or add it afterwards.

How to

  1. Open the task → Work → Time → Start clock. A clock shows on the task while it runs.
  2. Stop clock when you finish.
  3. Forgot? Add time by hand, with a paper docket no. and a note.

Good to know

  • Every change to a time entry is kept in its history. Clocks never stop by themselves.
  • The task shows today's time in full; older entries fold away under Earlier (n).

Planned time Live

Plan who's doing what and when, against a task or just described ("Office – quotes").

How to

  1. + → Plan time, or a task's Work → Time.
  2. Choose the task or type a description (recent ones are suggested), the days and the hours → save.

Good to know

  • Plans can cover several days, skipping weekends and holidays.

Calendar, roster and the Diary Live

See time and plans across days and people, and download your timesheet.

How to

  1. Calendar: day, week and month views of time and plans, and the gaps between entries.
  2. Roster: the whole team by day: plans, leave, sick days, working from home, holidays and away days. Select days on a person's row to plan time or book time off.
  3. Diary: your time, stock used and Take 5s, week by week; see below.

Good to know

  • Holidays set under Project cog → Project settings appear on the roster and calendar.

The Diary Live

One place for what happened, week by week: your time, the stock used and the Take 5s done. Open Diary in the top bar (it was called Time).

How to

  1. Show: the switches Time · Stock used · Take 5s turn each kind on or off (remembered on this device). A switch only shows when that kind is on for you.
  2. Pick the week with ‹ / ›, or Last week / This week. The week's total time is beside it.
  3. Narrow it: Project (the current one or All projects), Person (if you may see others: Me, Everyone or a name), Company (All companies, one company, or No company), and Group by Day, Paper docket no., Job or Task.
  4. Open one: tap a time row to edit it; tap a stock or Take 5 row to open its task on that entry.
  5. Download CSV saves exactly what's on screen.

Good to know

  • A task's own Work tab (time, stock, equipment) and Safety tab (Take 5s, permits, traffic) show the same parts for that task, each with a small switch. Work opens on Time; older entries fold under Earlier (n).
  • Hints say when something is hidden, e.g. "Stock used and Take 5s show with All companies.", or there are Take 5s in other projects (show All projects).
  • Everyone grouped by Day shows a grid of people by day; choose a time to see its entries, or a name to see only that person.

Dockets Live

Email the company a docket: proof of the work done, with the time and the stock used. A docket never shows prices.

How to

  1. In the Diary, tick the finished time rows for the docket (one day or several). That person's stock on the same task and day is ticked for you; tick or untick stock rows as needed.
  2. A bar shows what's ticked: rows, hours, days and stock uses → Send docket.
  3. Under Send to, tick the company's people or add Other email addresses (5 people at most). Add a Note to the company (optional) if you like → Preview → Send docket.
  4. Changed something after sending? Open the time entry → Resend → Resend to them or Send to other people. A resend is a new docket with its own number, built from the time as it is now.

Who can: people allowed to send dockets for their own time, or for anyone's; only while Dockets is switched on for the company.

Good to know

  • One docket is one project and one person, and covers up to 31 days, with a heading per day and the total at the end.
  • It carries only the stock you tick, and stock goes with its day's time: tick that day's time too. Each line reads like "Screws (A-12): 25 (from Van 2)": the item, its item number if it has one, the quantity in its own units, and where it came from (and who used it, if someone else).
  • The Person filter decides whose stock you can tick: Everyone includes everyone's that day (each line says who); otherwise the worker's own.
  • Sent rows show emailed DK-…, or changed since emailed if edited afterwards. A paper docket number is a separate box on each time entry (Paper docket no.).

11Stock and assets

Stock Live

Track items (like screws in boxes of 100) at locations (an office, a vehicle, a yard). Every change is a logged movement; counts are never simply edited. Switched on per company.

How to

  1. Open Stock (on a phone: More → Stock).
  2. Buy stock into a location, Move stock between locations, or Audit a location.
  3. Use stock on a task: its Work tab → Stock → + Use stock. Used by mistake? Remove (mistake) on that line.
  4. Reverse undoes a mistake; the original stays in history, struck through.
  5. Quick stock check: on Move, Write off and Use stock, tick Count what's left to count what is left at the place. Each line shows what it should be, and a different count asks for a reason (missing or found).
  6. Reports: stock on hand, stock used on each job, an item's history, and what's missing by location or person. Each downloads as CSV.
ActionWho
Buy stockAdmin and up
Move, use, write off, auditUser and up
ReverseWho entered it, or a manager

Good to know

  • Packs can be entered as packs, loose items or a part-pack estimate; estimates show with ≈.
  • A location that has used more than it held shows Out of balance until it's audited.
  • A place also lists the counted assets there, under Assets here (places, vehicles and people). They are kept in Assets: tap one to open it there.
  • A project's own stores: edit a place and choose Project store to make it a store of one project (a site container or compound). The stock is still the company's. The Project cog → Stock tile shows that project's stores and what was used on its tasks.
  • When the project ends: Hand back to the company moves the leftovers to a company place (or leaves them), and the store becomes a company place. Nothing is deleted.

Assets In testing

The company's equipment register: who has what, where it is, what is inside what, its condition and its history. Switched on per company (Company → Features → Assets). Open it from Company → Records → Assets.

How to

  1. The Register lists assets (search, or filter by kind, status and location; list or tree view). My assets shows what you hold and what is waiting for you to accept. Download CSV saves the list exactly as filtered on screen, for a spreadsheet; you get only the assets you may already see.
  2. An asset has Details, Contents, Where / who, Purchase & cover and History. Hand it over, accept or decline, take it, place it, put it inside another asset, mark it out of service, add a condition note with a photo.
  3. A project's own assets: when you add or edit an asset, Belongs to chooses the company or one of its projects. Opening Assets from the Project cog shows that project's assets in groups: Its own, At its stores and Used on its tasks.
  4. When the project ends: Hand back to the company clears the tag. Each asset's history records that it came back.

Good to know

  • The tag only filters. It never lets anyone see more than the company register already shows them.
  • Prices and insured values show only to the account Owner and Admins.
  • Counted assets also appear in Stock, and an asset's place shows the stock there.

Items and their units Live

Each item says how it's counted, so quantities read naturally everywhere: "1 can", "25 cans (1 box)".

How to

  1. Stock → Items → tap an item (or New item). Also from Company → Stock.
  2. Counted as (for example can) and Plural (optional) (cans). Leave the plural empty and it's made for you.
  3. Comes in a (for example box) Holding (25), so packs and loose items both count.

Who can: the account Owner, Admins and the company's stock manager.

Consumables that are charged In testing

Link a stock item to a price item, so every use on a task becomes a chargeable line at the client's rate. Stock itself never shows prices.

How to

  1. Open the item → Charged as → pick the price item (or Not charged (quantity only)).
  2. One stock unit is: how many of the price item one stock unit is, for example 0.01 when you count singly but price per 100 → save.
  3. Use stock on a task as usual. Each use appears in the task's Chargeable section, tagged From stock (and ≈ estimate when estimated).

Who can: link items: the account Owner, Admins and the stock manager. Amounts are shown only to the account Owner and Admins.

Good to know

  • Shows only when Billing is switched on for the company.
  • A line that came from stock can't be changed in Chargeable; change the stock use instead.
  • The item list says Charged as … under each linked item, and dockets show the item number beside the item.

12Photos, files and storage

Photos on tasks and notes Live

Take a picture or choose one from your phone; it's attached straight away.

How to

  1. On the task (or note), tap Photo → take or choose a picture.
  2. Tap a photo to view it full size, rename it, download it or share it.
  3. If an upload fails, Retry upload.

Download and share Live

Anything uploaded can be downloaded under a sensible name, or shared with someone outside TaTasque.

How to

  1. Open the photo, file or plan → download, or turn on its share link and copy it.
  2. Switch the link off to stop it working.

Good to know

  • Anyone with a share link can open that one file without signing in, until it's switched off.

Storage and the Trash Live

See how much space your company uses, find old photos and files nobody has opened, and move them to a Trash you can restore from. Nothing is deleted for good unless someone chooses to.

How to

  1. Company → Storage. The top shows what's used (or "Each project can hold 2 GB…") and the Trash's size.
  2. Free up space: choose Not opened since (6 months, 12 months, 2 years or a date), the kinds and how big → Show. The largest come first.
  3. Tick items (greyed ones are kept for a reason, shown under them) → Move to Trash… → confirm.
  4. Trash: Restore any item. Items in the Trash more than 30 days can be removed with Delete permanently, after ticking "I understand this can't be undone".

Who can: the account Owner and Admins.

Good to know

  • The Trash never empties by itself, and nothing newer than 30 days in it can be deleted.
  • Items in the Trash don't count toward your storage. Share links to them stop working.

13Safety

Safety is a company feature (Company → Features → Safety — SWMS and Safety — Take 5); a company that switches it off sees none of this (Owners and Admins still see what was recorded, read only). Safety Data Sheets and My safety are part of Safety — SWMS.

A walkthrough for safety reviewers covers the same features step by step for an external reviewer.

SWMS library Live

Safe Work Method Statements for high-risk construction work, written with your team and approved version by version.

How to

  1. Company → Safety.
  2. + New SWMS → start from Blank — write our own, a Starter, or a Copy of one you have → Create the draft.
  3. Edit the draft: fill in each section (the work, high-risk work, steps / hazards / controls, monitoring, review, emergency, who's in control) and Save each one.
  4. Submit for approval when nothing is missing. An Owner or Admin then approves it (Sign to approve… or Record the approval).
  5. To change an approved SWMS: Revise (new draft).

Who can: write and comment: Visitor and up; approve, reject, withdraw and archive: the account Owner and Admins.

Good to know

  • Starters are our own wording; have a WHS professional review them before use.
  • Flag for review marks a SWMS that needs looking at; a control that isn't working stops new Take 5s on it until a new version is approved.
  • Download all safety records (Owner / Admin) keeps a full copy.

Reading and signing on Live

Workers read the approved SWMS and sign that they've read it and will work to it. People not on TaTasque can sign on too.

How to

  1. Open the SWMS → its approved version → Open the reader. Read it through.
  2. Sign on → sign on the pad (or tick to confirm, if your company chose that) → tick the agreement → Sign.
  3. A guest: in the reader, Someone not on TaTasque signs on → their full name and email → Next — sign → they sign on your screen.
  4. Print or Email a copy from the reader.

Good to know

  • You can only sign on after opening the reader (within the last 2 hours).
  • Up to 10 guests per version in 24 hours; each is emailed a copy.

A copy for the principal contractor Live

Send the principal contractor a read-only copy of an approved SWMS by link.

How to

  1. Open the approved version → Copy for the principal contractor → Email the copy, or Make a link only → Copy.
  2. Under Copies made, Stop this link ends it.

Good to know

  • A link works for 90 days, and is shown only once when made.

Take 5 Live

A five-step check before starting work on a task, against the approved SWMS. If something isn't right, it stops the work until it is.

How to

  1. Open the task → Safety → Take 5 → Start a Take 5.
  2. 1. Stop: tick the SWMS for this work. Each shows whether you've signed onto this version; if not, Read it and sign opens the reader → read it → I've read it — sign.
  3. 2. Look: each control In place, NOT in place or Doesn't apply.
  4. 3. Assess: answer the questions; add + Site hazard for anything you see now and rate it.
  5. 4. Control: say if the work is NOT as the SWMS describes.
  6. 5. Sign and finish. The outcome is PROCEED or STOP.
  7. Others on the job: I've read it — co-sign, or I don't agree — Stop.
  8. Someone not on TaTasque: + Someone not on TaTasque signs → their full name and email → Next — sign. If they haven't signed the SWMS, they read it first and sign that too.

Who can: Visitor and up. The Take 5 register (all Take 5s, with a CSV) is for the account Owner and Admins: Company → Safety → Take 5 register.

Good to know

  • A STOP puts a "Safety stop" road block on the task; only a later PROCEED Take 5, or an Owner / Admin with a note, clears it.
  • A Take 5 never replaces a SWMS for high-risk construction work (the ⓘ beside the Take 5 says so).
  • On the task: a line ✓ Done today (with + Another) or Start a Take 5; each Take 5 is one line (PROCEED / STOP, time, SWMS, who); tap it to read it. Older ones fold under Earlier (n).
  • No signal? The SWMS saved on the phone opens in the reader; a Take 5 or a signature is Saved on this phone and sent when you have signal. A STOP with no signal says so: tell your supervisor yourself.
  • Finishing with a SWMS not signed flags the Take 5 and tells the Owner / Admin.

Safety Data Sheets Live

Keep the supplier's current Safety Data Sheet (SDS) for every chemical you use. The hazardous ones make up your register, and people can sign that they've read them.

How to

  1. Company → Safety → Safety Data Sheets. Find one with Search, Hazardous only or Show archived.
  2. + Add SDS: the Product, Supplier (optional), whether it's Hazardous — list it on the register, where it's stored, whether People sign that they've read it, the supplier's SDS (a PDF, up to 20 MB) and the Date shown on the SDS. Key hazards and PPE are optional → Add.
  3. Read and sign: open the sheet → Open SDS and read it → come back → I've read it — sign.
  4. Show QR gives someone a read-only copy (see Show QR / their copy).
  5. A new sheet from the supplier? New version. Older versions stay, marked Superseded. Archive one you no longer use (Bring back undoes it).
  6. Register: every hazardous chemical with its current sheet; Download CSV or Download PDF.
  7. Safety people…: tick who else may add and update sheets, and choose the Safety admin who's told when a sheet gets old → Save.

Who can: everyone reads and signs; adding and editing sheets: the account Owner, Admins and Safety people; choosing Safety people: the account Owner and Admins.

Good to know

  • A sheet more than 5 years old says Ask the supplier for the current SDS, and the Safety admin is told.
  • You can only sign after opening the sheet (within the last 2 hours).
  • No signal? Open SDS opens the copy saved on the phone: the chemicals for your offline tasks and the hazardous register. Signing in the library needs signal (on a Take 5 it doesn't; see below).

Chemicals on the Take 5 Live

The Take 5 lists the chemicals for the job, so everyone has read the SDS before starting.

How to

  1. In the Take 5, Chemicals on this job: tick each chemical you're using. Stock used on the task is already ticked (Used on this task); + Add a chemical finds others.
  2. Not signed yet? Read it and sign → Open SDS and read it → sign. Or Not now: the chemical stays ticked.
  3. Finishing with a sheet not signed asks first: Finish without signing (the Take 5 is flagged SDS not signed and your supervisor is told) or Read it and sign first.
  4. Someone not on TaTasque: + Someone not on TaTasque signs → their full name, email and company. For each sheet they haven't signed, they read it and sign too (or Not now).

Good to know

  • Each chemical says where you stand: Not signed yet, ✓ You've signed this SDS, or that a newer version needs signing again.
  • No signal? Signing still works if the sheet is saved on the phone: Signed on this phone — not sent yet, sent when you have signal.
  • The finished Take 5 lists each chemical as signed, not signed, or more than 5 years old. A sheet signed afterwards shows "signed later".

My safety Live

Your own safety record in one place: what you've signed, what needs signing again, and your Take 5s.

How to

  1. Company → Safety → My safety, or your avatar (top right) → My safety. Your own tickets and licences: avatar → My qualifications.
  2. Sign again — a newer version lists anything updated since you signed → Read and sign.
  3. Then SWMS signed, Safety Data Sheets signed and your Take 5s (PROCEED or STOP, newest first; Older loads more). Tap a Take 5 to read it.
  4. Download PDF or Download CSV, with all your Take 5s or the last 12 months.

Who can: everyone sees their own. The account Owner, Admins and Safety people can choose a Person to see anyone's (read-only); each look is recorded.

Show QR / their copy Live

Give someone a read-only copy of a Take 5, a SWMS they signed, or a quality record: a QR code to scan, or a link.

How to

  1. Tap the QR icon on a Take 5 line (or Show QR in the SWMS reader or on a Safety Data Sheet; Copy link / QR on a quality record).
  2. They scan the QR with their phone's camera, or use Copy link, or Send from my email (opens your own email app with the link).
  3. The page the link opens has Download PDF.
  4. Done with it? Stop this QR link → Yes — stop it for everyone.

Who can stop it: who made it, or the account Owner and Admins.

Good to know

  • Anyone with the link can view it, read-only, until it's stopped. Showing the QR again makes a new link.
  • Stopping a copy keeps the signature and the record; only the link stops.

14Quality

Quality is a company feature (Company → Features → Quality).

A walkthrough for quality managers shows the same features step by step, with the real screens.

Record types Live

Each record type is one kind of check your people do, with the checks you build for it: what is measured and its unit, the tolerance, how often a reading is taken, how it's accepted, the clause it comes from, the method, who checks and any notes. A published standard is a reference: cite it by clause.

How to

  1. Company → Quality. The first screen is Record types; Show retired shows old ones too.
  2. Set up your Methods once: how the work is checked (for example a total station or a level run). Type a New method → + Add method, or pick from the suggestions. Each one can be renamed, retired or deleted.
  3. + New record type (or Start from a standard and Copy into my record types).
  4. Build the checks: + Step, what to do, the kind and its numbers, the method, who checks, notes → Save draft → Publish.

Who can: everyone reads published record types; creating and publishing (and the methods list) is for the account Owner and Admins.

Good to know

  • Each step picks its Method from your list; on the task it shows as "Method: … · Checked by: …".
  • Renaming a method changes drafts on their next save; a published version keeps the name it had.
  • Shared criteria holds checks you reuse across record types.

A task's record type Live

Give a task its record type, so the person on site sees exactly what to check.

How to

  1. Put it on the form (Admin): Project cog → Workflows & fields → Workflows → the workflow → Edit the details layout → → + Add a field → Record type, and drop it in a box. It shows only on forms where it's placed.
  2. On the task, choose its Record type (it saves at once). Open what to do (or the What to do tab) shows the steps.
  3. A workflow's Default record type gives every new task in it that record type.
  4. When a newer version is published: Use vN.

Who can: User and up set it on a task.

Quality records Live

Record that the work was checked against its record type: each check Y or N, measured values, then signed and sealed with a number.

How to

  1. Open the task → What to do → Quality records → + New record. It saves as you go (a draft).
  2. Fill in Details (date and time, who checked, Supervisor, area, location …), References, Equipment used and the Checks: each Y or N, with a measured value and a comment where needed.
  3. Sign and seal. The record gets its number and can't be changed after that; a mistake is fixed with Correct this record.
  4. Any check answered N flags the record: the task stays open until Record action taken (what was done, with photos if you like).
  5. Share it: Print / Save as PDF, or Copy link / QR (see Show QR / their copy). A client representative can sign too (Client rep signs).

Who can: User and up fill in and sign records; Void and Copies made are for the account Owner and Admins.

Good to know

  • A standard's Criteria table lists every criterion with its rule and clause.
  • Supervisor is picked from the project's people (names only). Equipment used is picked from the company's equipment register, with its calibration status. A serial number that isn't in the register is allowed, but is marked "Not in the register".
  • References are links, not just typed text. A reference can be another task (search by its Reference, key or title; a typed number that matches a task's Reference offers to link that task) or a drawing revision from the drawing register. Design model used picks from the register too (your own models first); typed text is still allowed. The record keeps the label and value as they were when you linked them.
  • Conformance request: link the task that asked for the work (tasks linked to this one come first), or Send to engineer to email the project's Engineer (or an engineer outside the project) and ask for it. The line beside it says Sent, Awaiting reply or Answered, and Mark reply received covers an answer by phone. A task you pick is also related to the record's task, so it shows on both tasks' Relationships. A record can be sealed without one: it then says Awaiting conformance request. Adding it later is a dated note; what was signed never changes, and a correction carries it forward.
  • Record numbers: Company → Quality → Quality record numbers → Prefix. A new prefix applies to new records only.
  • Who is told about an N: the people above in the client's contacts. Where escalation stops… (Company → client contacts, Owner / Admin) stops it at a role or at named people; nobody above them is told.

Construction library In testing

Each project keeps its own set of construction element types (pavement types, kerbs and so on) from a state library, with each layer's depth and thickness, and the section drawing. A quality record can use it to show how deep a layer should be. Switched on per company (Company → Features → Construction library, which needs Quality). Open it from the Project cog → Safety & Quality → Construction library.

How to

  1. Take a type from the state library into the project's set. When the state library has a newer version, Review shows what changed.
  2. Set up from drawings (Owner and Admins): tick drawings already in the drawing register (or add one with the register's own upload), tap the pages that show typical sections, then type each layer: name, order, thickness, whether it varies or is a minimum, and whether it is an interlayer → Save. Every value remembers which drawing it came from.
  3. A new set starts in set-up. Once it is approved, later changes are proposed by an Owner or Admin as site changes (the value, where it comes from, why). They wait, amber, until the releaser releases or rejects the batch.
  4. Change on a layer or variant row opens that row's boxes to propose a new value.
  5. On a quality record, the Construction library box: pick the type and the layer you are checking, and the target depth from the approved copy shows.

Good to know

  • A layer whose thickness varies: type its thickness once on the record. It is kept on the record ("Kept on the record · project set vN") and the targets below it are worked out from it, for example "Target −305 mm (worked out with … = 45 mm)". The print shows "Worked out with …".
  • Until that thickness is typed, depth and thickness rows under the varying layer aren't judged. Rows with a worked-out target are judged against that target.
  • Tolerances aren't asked for when setting up from drawings. Every value carries a general warning to check the current edition and your contract.

15Working offline

Offline phone mode Live

Your phone keeps a copy of your tasks so you can read them, and make changes, with no signal. Changes are sent when you're back online. A company feature (Company → Features → Offline phone mode).

How to

  1. With signal, tap your initial → Save for offline. It also saves by itself when the task list loads.
  2. Offline, a bar shows Offline · saved HH:MM, and how many changes are waiting.
  3. Back online, changes are sent. If someone else changed the same thing, Review lets you Keep yours or Keep theirs.

Good to know

  • Saved: your assigned tasks and the jobs you've opened tasks in.
  • Only task edits wait for signal; anything else says "Needs signal".
  • Signing out deletes the phone's copy; after 7 days without signal it locks until you reconnect.

16People and access

LevelTypically can
OwnerEverything, including handing the project on and deleting it
AdminManage fields, statuses, lists, members, sharing, companies and stock set-up
MemberAs User, plus map plans and drawing sets
UserCreate and edit tasks, track time, use, move and audit stock
VisitorSee tasks; read and sign safety documents and Take 5s
ViewerSee tasks, plans and stock; no changes

Members and invitations Live

Who's in the project, at what level, and who's been invited.

How to

  1. Project cog → People (also pinnable as Project people). It lists everyone on this project in one place, from the project's org chart and its logins: search, filter by company, Has a login. Tap a person for their page.
  2. Invite someone who is already in your company: people on the company list who are not yet on this project are offered with an Invite button (and Resend for one already invited). Someone with no email asks for one first. Select several to invite them together.
  3. The Members button inside it opens the members screen: invite someone at a level. Type their name in the Name box and it searches the people already in your company's table; pick one and their email comes with them. Or type an email. The invite goes out and they get an email; change a level; remove someone; or leave / hand the project on.
  4. Several at once (Owner and Admins): Select → tick people (Shift-click ticks a run, Tick all (shown) ticks the search) → Set company…, or pick exactly two → Merge…. A merge shows everything that moves first, and Undo a merge… works for 7 days. On the org chart view, a tick takes the person's branch; Tick only this person takes just them.

Who can: see members: User and up; invite and change: Admin and up.

Good to know

  • The account's Owner and Admins can do everything in every project of the account.

The company's People Live

One list of everyone connected to your company: your own people, the people at companies you work for, and everyone who has been given access to any of your projects.

How to

  1. Company → People → People. (The Company page has one People tile; Permissions and Work groups sit beside it.)
  2. Filter with the three buttons, each with a count: Our people, Company not set (people added by a scan or a request form who have no company yet, so they are not on your org chart; open one to set it, or Select several and use Change a field… → Company) and Customers’ people. Show retired brings back people you retired.
  3. Each person shows what they are on, as a line starting On (for example a project, or a folder shared with them). This list only shows who has access. It never gives anyone any.
  4. Supervisors: open a person and set Reports to (and Also reports to, if they have a second boss). That builds the org chart. Every login in the company has a People row, so the Owner and Admins can be picked as a supervisor too.
  5. Remove from company… (Owner and Admins) on a person's login box takes away their access to the company. Their past work stays. Tick Also retire them from People to retire the row as well, then Remove access. A login that has no People row is listed apart under Logins with no People row, with the same Remove from company….
  6. Folders shared with them… (Owner and Admins) opens a list of what they can reach now: whole projects, folders or lists, and single tasks. Remove takes one away. To add one, choose the Project, the Folder or list (or the whole project) and the Level, then Share.
  7. Select several people to change a field together, or Merge… two. Managers… opens the managers list.

Who can: see: members of the company; edit, remove and share: Owner and Admins. Someone can change their own details.

Good to know

  • Anyone who sent a request form and was added shows here marked Please verify until someone confirms them (see Request forms and orders).

My details, and projects shared with you Live

Your own details travel with you, so forms and companies can fill them in for you.

How to

  1. Tap your initial → My details: your name, phone and job title, and your email (read only, you sign in with it). These are your personal details. My company shows your own company's row in its list (the Owner and Admins edit it; members can read it). The old “Your name” item is now here, and your own page in People is My page in People.
  2. When you send an order form while signed in, there is no code step and no Find yourself: your details and company are filled in, and blanks on your profile are filled from what you typed. A different value is only offered after you send: Update your profile with these details? Update or No thanks.
  3. Create your own project: if a project is shared with you but you have none of your own, the tree shows Create your own project (and the top + is labelled). Not now hides the hint for 30 days.

Good to know

  • Some people are limited inside a shared project but have full use of their own. Shared projects look amber and say Shared; projects you control stay blue.
  • A person with read-only access to a task sees only its Details and Comms tabs.

17Setting up

A project Live

Admins shape each project from the Project cog: it opens a page of big tiles in sections (This project, People, Safety & Quality, Records, Money), then Rename project and Delete project. A tile you can't use is grey with a lock; tap it to see why. Fields are the boxes of information on a task — e.g. Due date, Company, Record type. A workflow is what a list's tasks use: which fields show, which are required, and the statuses they move through.

How to

  1. Workflows & fields: Standard fields come with TaTasque (the Status row → Statuses & workflows…, Road block labels and more); Your fields are the ones you add, in groups you can fold.
  2. Workflows (in Workflows & fields): which fields each list's form shows, which are required, the statuses it uses, and its title template. A list gets its workflow from Lists, or from a job's or folder's ⋯ → Workflow….
  3. Who can see a field: open a field in Workflows & fields and use Who can see this field: Everyone on the task (the default), Everyone except read-only, or Hidden, shared back with the people and Work groups you choose (for example money fields hidden from most staff). Owner and Admins always see every field. A hidden field is not sent at all to people who cannot see it: no value, no label, in the task, calendar, print, emails or copies. Anyone who can see a field can change it (when they can edit the task).
  4. A workflow's form is arranged in its Details layout (Workflows & fields → Workflows → the workflow → Edit the details layout →).
  5. Project settings: week start, working hours and days, Time zone, holidays, day states, plan length, the map grid, and who sees a task. Time zone left as "Same as the company" follows the company's; set it only if the work is somewhere else. Days, due dates, timesheets, reminders and emails for the project follow it.
  6. Import tasks and, for a company that has them, Save as template… are here too (see Templates).

Who can: Admin and up.

Deleting a project Live

Deleting a project removes everything in it, for everyone, at once. You can download its records first.

How to

  1. Project cog → Delete project. The screen lists what will be deleted: the tasks with their photos, files and history, plus each kind of record the project holds (safety, quality, time, dockets, the email log, the drawing register and so on).
  2. If the project holds records, Download this project's records saves them as one file (safety, invoices and dockets, quality and checkpoints, the drawing register and the email log). You don't have to wait for it, so download first.
  3. Type the project's name → Delete for good.

Who can: the project's Owner.

Good to know

  • It can't be undone. Backups made before today are removed within 14 days.
  • The project's own assets and stores aren't deleted: they go back to the company. Stock used on its tasks stays, with no project.

A company Live

Company-wide settings live under the Company button.

How to

  1. Features: switch features on or off for everyone in the company. Switched off: hidden; Owners and Admins still see what was recorded, read only. Nothing is deleted. The list is a tree: a feature that needs another sits folded under it ("N inside"), and works while that one is on. Under a switched-off feature, a switch is greyed with "Switch on … first"; its own setting is kept for when that one is back on.
  2. The Company button opens a page of big tiles in sections: People (the one People tile, see The company's People; Permissions, what each level may do; Work groups), Records (Tables, Assets, Stock), Safety & Quality, Money (Billing), How work runs (Priority levels, Email sending — sender name, replies, signature; Notifications) and Account (Features, Branding, Storage, Plan form, Content packs, Name and time zone). A tile you can't use is grey with a lock; tap it to see why.
  3. Time zone: Name and time zone sets the company's zone (Australian zones first; daylight saving included). Days, due dates, working days, timesheets, reminders, dockets and emails follow it, unless a project sets its own.
  4. Content packs: the industry and region content the company uses (for example standards and signs). A new company starts with the general list; adding a pack adds its content, and removing one never deletes what has been used.
  5. Pin what you use most: tap the pin in a tile's corner (in the Company or Project page) and it gets its own button on the top bar. Tap it again to take it off. The top bar starts with only Tasks and Map. Anything else (Diary, Calendar, Stock, Emails, or a tile from the hubs) appears only when you choose Pin to the top bar; an unpinned view waits under the Project cog → Views. Your pins follow your login to every device. On a phone the first ones sit on the bottom bar and the rest in More.

Who can: the account Owner and Admins; only the account holder changes Features.

18Linked systems

Other programs In testing

TaTasque connects to other programs through its API. A project can stay linked to another task program, so tasks, statuses, assignees and destinations sync both ways. Each list can be connected to a list in the other program, or kept in TaTasque only.

Good to know

  • Don't delete tasks or lists in the other program as a way of leaving it: deletes travel across the link.

19In testing and coming

In testing In testing

Coming Coming

  • Start and due dates drawn on the calendar. (The dates themselves are on tasks now.)
  • Further Line up improvements.
TaTasque is in active development. This guide reflects the app as of 6 November 2026 (TaTasque 2.0); features marked In testing or Coming may change.